In the first 90 days after buying a luxury home in Scottsdale, decide what you will change before you move in, confirm who can legally and safely do the work, and sequence design, remodel and furnishing so each step supports the next. The scope you choose sets the clock: furnishing projects typically take 4 to 6 months, remodels take 6 to 8 months and new builds take 12 to 24 months.
This guide covers what to do after buying a luxury home, window by window, because each step depends on the one before it. Lauren Lerner and Living with Lolo, a Scottsdale interior design firm and licensed general contractor (ROC #347577), plan projects for owners across Scottsdale, Paradise Valley and Phoenix. The plan below shows how design, remodel and furnishing fit together, and what to check before you sign anything.
The 90-day plan at a glance
Window
Focus
What you have at the end
Days 1 to 14
Live in the house, document it and list what must change
A priorities list and measured floor plans
Days 15 to 30
Set the scope and budget for design, remodel and furnishing
A written scope and budget range
Days 31 to 60
Verify licensing, permits and community approvals
Permits and approvals under way
Days 61 to 90
Place orders, lock the schedule and plan move-in
Orders placed and a dated schedule
Days 1 to 14: Document the house and decide what must change
After buying a luxury home, resist the urge to start ordering, because early orders rarely match the final plan. Spend the first two weeks living in the house and write down what works and what does not. Note where the light falls at different times of day, which rooms you use most and which finishes you plan to keep.
Safety and function come before style, so confirm that the seller or builder has transferred locks, alarms, garage openers and smart-home accounts to you, and ask for manuals and warranty contacts. Next, collect the documents that describe the property: the inspection report, any seller disclosures, floor plans and warranties for appliances and systems. Take photographs of every room before anything changes. Then measure each room, or ask your designer to, so planning starts from accurate dimensions.
Use these questions to organize the first two weeks:
Which rooms do not work for the way you live?
Which finishes will stay, and which must change?
Is any part of the plan structural, such as moving walls, widening openings or changing a kitchen layout?
Does your community require architectural review for exterior or visible changes?
A first walkthrough with a designer helps at this stage. Living with Lolo starts with a 15-minute discovery call and a one-hour virtual home consultation, after which you receive a proposal with your design fee, investment estimate and projected timeline. Our seven-step process shows what happens at each stage.
Days 15 to 30: Set the scope and budget for design, remodel and furnishing
By the third week, you can separate the project into three scopes. First, furnishing adds furniture, lighting, art and styling to the house as built. Second, a remodel changes the layout, structure or finishes, and includes furnishings. Third, design-build places design and licensed construction under one team, as described on our design-build firm in Scottsdale page.
Each scope carries a different budget and timeline, so compare them separately. At Living with Lolo, furnishing-only projects start at $75,000 and range to $450,000 and above, while remodel plus furnishings runs from $400,000 to $1.5 million and above. Living with Lolo quotes design fees separately, and these figures are planning ranges, not quotes. Our Scottsdale remodeling contractor page explains how a remodel runs.
Ask each firm you interview three questions: who holds the license, who is responsible for permits, and who orders and receives the furnishings. The answers therefore show how many parties you will need to coordinate.
Decide the order before you decide the details. Construction comes first, finishes come second and furnishings come last, because a sofa installed before a remodel needs protection for months. If you are weighing a remodel against a furnishing-only plan, our guide to the phases of a whole-home remodel in Scottsdale shows what each phase involves.
Days 31 to 60: Verify licensing, permits and community approvals
This stretch is where plans meet regulations. Arizona requires a license to contract for construction, so check the contractor's record before you sign. The Arizona Registrar of Contractors recommends reviewing the license record, confirming that the license class covers the planned work, and spelling out the price and the responsibility for building permits in the written contract.
The same guidance notes that permits are the owner's responsibility, although many contractors include them in the contract. In the City of Scottsdale, work that changes structure, plumbing, electrical or mechanical systems needs City of Scottsdale permits. However, Paradise Valley is a separate town with its own building department. For a fuller primer, read do interior designers handle permits in Arizona.
Next, check your community rules. The Registrar of Contractors states that owners must tell the contractor about CC&R restrictions and construction policies before both sides sign a contract. In neighborhoods such as Silverleaf and DC Ranch, community architectural review can add time, so ask early whether it applies to your plan.
Finally, call before you dig. Arizona's Call Before You Dig law, A.R.S. 40-360.22, requires excavators to determine where underground utilities run before digging in covered areas such as utility easements, and utility operators must mark them within two working days. Ask your contractor to confirm that step for landscape, pool and outdoor kitchen work.
Days 61 to 90: Place orders, lock the schedule and plan move-in
By the third month after buying a luxury home, decisions turn into orders. Custom furniture, stone, cabinetry and lighting take the longest, so the team orders them first against a schedule that matches construction milestones. At Living with Lolo, Lauren Lerner's team orders every specified material and tracks each order, so deliveries match your installation date.
Next, decide where you will live during the work. Many Living with Lolo clients in Paradise Valley, Scottsdale and Arcadia travel frequently or split time between homes, and they leave during construction and return to a finished home. If you plan to stay, set expectations about dust, noise and access, and protect floors and furniture in rooms that remain in use.
Agree on how you will handle changes before work starts. The Registrar of Contractors advises owners to understand how a change order affects total cost and completion date, and notes that both parties must sign it.
Then set a dated schedule that lists design approvals, permit submittals, orders, construction milestones and installation. A written schedule is the best check on a project that involves several trades.
How to sequence design, remodel and furnishing after buying a luxury home
Whatever the scope, the order stays the same:
Design plan and budget approved in writing.
Licensing, permits and community approvals in place.
Construction and trade work completed and inspected.
Finishes installed, then long-lead furnishings received and inspected.
Furnishings installed, followed by art, accessories and final styling.
A finished living room, the result of design, construction and furnishing sequenced in order.
Skipping ahead therefore causes rework. For example, custom drapery hung before the painter finishes can suffer damage, and furniture ordered before final floor plans can arrive at the wrong scale. If you are also planning the interiors, our guide on how to furnish a new luxury home in Scottsdale covers the furnishing steps in detail.
How the first 90 days after buying a luxury home differ by scope
The 90-day window looks different for each scope, even though the steps are the same. Use these two examples to see where your project falls.
A furnishing-only plan after buying a luxury home
With furnishing only, the structure stays as built, so permits are rarely the issue. The first month goes to floor plans, room priorities and budget. The second month goes to approvals and the first orders, with custom upholstery, rugs and lighting placed first. By day 90, orders are in production, so the 4 to 6 month furnishing timeline is under way. Our Scottsdale full-service interior design page explains how we manage that scope.
A remodel with furnishings after buying a luxury home
While a furnishing-only plan starts with orders, a remodel adds drawings, permits and trade scheduling. The first month still covers documentation and scope, but the second month goes to construction documents, permit submittals and community review. Your team places orders for cabinetry, stone and lighting as soon as the schedule firms up. A remodel typically takes 6 to 8 months, with furnishings included, so by day 90 the project may be in permit review or early construction. Our high-end home remodel page shows the scope we manage.
What the data shows about spending after buying a luxury home
National data shows that the months after a purchase are when most of the spending happens. The National Association of Home Builders' August 2026 study of Consumer Expenditure Survey data from 2020 through 2023 found that buyers of newly built homes spend an average of $26,882 on appliances, furnishings, and remodeling and repairs in the first year after purchase. Buyers of existing homes spend $18,673, and homeowners who do not move spend $9,457.
The study also found that furnishing spending peaks in the first year and stays moderately higher in years two and three. For buyers of existing homes, spending on alterations and repairs is the most persistent. These are national averages across all price levels, so luxury projects will run higher.
Meanwhile, the local market adds context. Compass advisor Laura Jorden's November 2026 market update, based on ARMLS data, reports that Scottsdale homes priced at $1.5 million and above closed at a median of $2,205,000 in October 2026, across 137 closed sales, at 96.2% of list price. In Paradise Valley, homes at $1.5 million and above closed at a median of $5,300,000, across 17 closed sales.
Mistakes to avoid after buying a luxury home
Ordering before measuring. Furniture and window treatments ordered from guesses often arrive at the wrong scale.
Signing with an unverified contractor. Check the license record and class before you sign, and keep the license number on the contract.
Skipping community review. Association rules can shape exterior and visible changes, so check them before the design is final.
Furnishing before construction. Pieces delivered early need storage or protection, and trade work can damage them.
Working without a written schedule. Several trades and long-lead orders need one dated plan.
Who can help, and how to start
Owners can manage these steps themselves after buying a luxury home, and many do. However, a design-build team becomes most useful when the plan includes permits, structural work and long-lead orders at the same time. Our comparison of an interior designer versus design-build explains when each model fits.
Living with Lolo, founded in 2017, holds Arizona ROC #347577 and has earned PHOENIX magazine Best of the Valley Readers' Choice, Interior Design category, four years in a row (2023 through 2026). See completed work in the portfolio, or read about our work in Paradise Valley and Phoenix. When you are ready, contact Lauren Lerner and the team to talk through your first 90 days.
Ready to Talk Through Your First 90 Days?
Living with Lolo can plan your design, remodel and furnishing in Scottsdale, Paradise Valley, Arcadia or the greater Phoenix area, in the order that protects your schedule and budget.
Frequently Asked Questions After Buying a Luxury Home in Scottsdale
Where to start and how long it takes
What should I do first after buying a luxury home in Scottsdale?
Live in the house for the first two weeks, document it with photographs and measurements, and write down what must change. Collect the inspection report, disclosures, floor plans and warranties. Wait to order furniture or start construction until you have the scope and budget in writing.
Should I remodel before I furnish?
Yes, if the plan includes a remodel. Construction comes first, then finishes, then furnishings, so pieces are not stored or damaged during trade work. If you plan no construction, you can start furnishing as soon as the floor plans and measurements are final.
How long do a remodel and furnishing take after buying a luxury home?
At Living with Lolo, furnishing projects typically take 4 to 6 months and remodels take 6 to 8 months, with furnishings included in the remodel timeline. New builds take 12 to 24 months. Permits, community review and custom lead times can change the schedule, so a discovery call gives a realistic timeline for your home. See our process page for the stages.
Permits, living arrangements and service area
Do I need permits for a remodel in Scottsdale?
Work that changes structure, plumbing, electrical or mechanical systems needs City of Scottsdale permits. However, Paradise Valley is a separate town with its own building department. A licensed contractor such as Living with Lolo, ROC #347577, can prepare the permit set and manage the review.
Can I live in the house during a remodel?
It depends on the scope. Many clients who travel or split time between homes leave during construction and return to a finished home. If you stay, set expectations about dust, noise and access, and ask how the contractor will phase the work.
Does Living with Lolo work in Paradise Valley and Phoenix?
Yes. Living with Lolo serves Scottsdale, Paradise Valley, Arcadia and Phoenix. Start with a discovery call to confirm scope, location and timeline.
Lauren Lerner
Principal Designer, Living with Lolo
Lauren Lerner is the founder and principal designer of Living with Lolo, a luxury interior design studio in Scottsdale, Arizona. Her work has appeared in Architectural Digest, House Beautiful, and The Wall Street Journal. Learn about Lauren and the studio.
Lauren Lerner is the founder and principal designer of Living with Lolo, Scottsdale’s luxury interior design and licensed design-build firm. Voted PHOENIX magazine’s Readers’ Choice winner for Interior Design four consecutive years, Lauren leads projects from concept through construction for high-end homes in Scottsdale, Paradise Valley, and Phoenix.
Living with Lolo is a Scottsdale, Arizona-based luxury interior design and construction firm. The company specializes in full-service interior design, design-build remodeling, and construction-led renovations for high-end residential homes in Scottsdale, Paradise Valley, and Phoenix. Living with Lolo manages both interior design and licensed general contracting under one roof, guiding projects from concept through construction and white-glove installation.
Lauren Lerner is the founder of Cited Co and creator of Living with Lolo. Her professional hub is at laurenlerner.com.